Water Supply And Sewerage In Movilita, Sinesti And Rosiori - 2 Lots
|
Tender Detail : |
Contract notice: Il-cl r03 water supply and sewerage in movilita, sinesti and rosiori - 2 lots
• rehabilitation of the distribution network, l = 573.00 m; • extension of the water distribution network, l = 24,256.94 m; • extension of the domestic sewerage network, l = 27,551.78 m; • wastewater pumping stations (extension) = 8 pcs .; wastewater discharge pipe l = 2,545.44 m; • wastewater transfer station = 1 pc. • wastewater transfer pipe l = 589.47 m. for all the above mentioned investment objectives the following activities will be performed: • supply and installation machinery and technological equipment • supply and commissioning of materials for water and sewerage networks • testing and commissioning • carrying out all necessary works for automation and data transmission, locally and regionally, • monitoring the operation of works and providing assistance to the responsible personnel during the period of notification of defects, when necessary • • remedying any defects occurred during the period of notification of defects 1095 days • training of the beneficiarys staff and / or operator
Uat sinesti • extension of the treated water supply pipe, l = 12,172.45m; • rehabilitation of the distribution network, l = 451.00m; • drinking water pumping station. = 1pc; • extension of the sewage network, l = 14,447.29m; • wastewater pumping stations (extension), = 6pcs; • wastewater discharge pipe, l = 2,899.92m; • wastewater transfer pumping stations (extension) , = 1pc; • wastewater transfer collector (extension) l = 12,474.36m.uat rosiori • rehabilitation of the water distribution network, l = 310.00m; • extension of the water distribution network, l = 6,337.00m; l = 16,491.90m • wastewater transfer station (extension), = 1pc • wastewater transfer collector (extension), l = 4,827.00m, for all the above mentioned investment objectives the following activities will be performed: supply and installation technological machinery and equipment, supply and commissioning of materials for water and sewerage networks, testing and commissioning, carrying out all necessary works for automation and data transmission, locally and regionally, monitoring the operation of works and providing assistance / consulting the responsible staff during the period of notification of defects, when necessary, remedying any defects that occurred during the period of notification of defects of 1095 days, training the staff of the beneficiary and / or operator
|